1.The
project of machines and steel structures to Port Said
March of 2006 we cooperated with a brotherforwarder carrying
the numbers of machines and steel structures equipmens
to Port Said .
2. The
project of machines to Ukraine
August of 2006 we carried the project cargos of Hunan
New Timehope Consctruction Machinery Co., Ltd. to Ukraine
. The cargos included the roller, excavator and some
other construction machines .
3. The
project of steel structures to Vietnam
July of 2007 we cooperated with CHINA SHANGHAI (GROUP)
CORPORATION FOR FOREIGH ECONOMIC AND TECHNOLOGICAL COOPERATION
carrying item cargos of a steel structure equipments
to Vietnam , which was one year time charter . meanwhile
there were some strict requirements with the steel structures
which was no rain and no scratch in the process of loading
and discharge , we met the requirements and did a perfect
job.
4.The
wind power plant project
January of 2008 , we carried the cargos of wind power
plant project from ZheJiang Huayi Wind Energy Development
CO., LTD . All the equipments were over large and over
long , the height of the wind tower was 21.7M and the
weight of every wind tower was more than 50 tons . We
solved these different kind problems in the transportation
and ensured the cargos of this project be loaded to
the destination timely and smoothly .
5. Voyage
charter of the pipelines to Haiti
January of 2008 we cooperated with Shanghai Liquefied
Natural Gas CO., LTD . We carried liquefied natural
gas pipelines in the way of voyage charter from Japan
to Shanghai , and from Shanghai to Guangdong , then
back to the port of yangshan in Shanghai . We arranged
with all the jobs of the whole project .
6.
The
project of vehicles to Ukraine
February of 2008 , we cooperated with China Heavy Duty
Truck CO., LTD carrying 107 vehicles from shanghai to
Ukraine in the way of voyage charter . The vehicles
were including tractors, trucks, cement mixers and flat
trucks . The whole project service contained the transportation
in China , clearance and shipping . Later we carried
some other accessories of this project . In the whole
process there was not any scratch on any vehicle , and
we got the praise both from consignee and shipper .
7. The
project of auto-vehicle exhibition in Dubai
September of 2008 , we cooperated with SHANGHAI VOSTOSUN
INDUSTRIAL CO., LTD successfully carrying some construction
machines to auto-vehicle exhibition in Dubai with the
way of ro-ro vessel . For the reason of exhibition ,
the consignee asked that there was no any little scratch
on any machine . any delay is prohibited. We finished
the task perfectly and also applied the shipments of
Clearance in Dubai .
8.The
tower cranes project to LOBITO in Africa
October of 2008 , we cooperated
with Hitachi company in japan. We carried some tower
cranes to LOBITO which was a project of african-aid
project . The engine of tower crane was over 80 metric
tons and there were too many accessories in the project
. We all knew that Japanese company had strict requirements
in transportation . We met their requirements with a
high quality service , and finally we carried eight
tower cranes for several times .
9.The pile driver project
In the year 2009 , we cooperated with Hunan Sunward
Intelligent Machinery Co., Ltd . We shipped 34 sets
of hydraulic static pile driver to Ukraine . In the
whole transportation , we kept the pile drivers in good
condition .
10.The
project to INDONESIA
September of 2010 , we cooperated with CHINA SHANGHAI (GROUP) CORPORATION FOR FOREIGH ECONOMIC AND TECHNOLOGICAL COOPERATION carrying 21 sets of construction vehicle from the making factory to the building site in Indonesia. Our door to door service secure the whole project being finished smoothly and timely .
|