点击这里给我发消息
   



















 
----Introduce of project
1.The project of machines and steel structures to Port Said
March of 2006 we cooperated with a brotherforwarder carrying the numbers of machines and steel structures equipmens to Port Said .

2. The project of machines to Ukraine
August of 2006 we carried the project cargos of Hunan New Timehope Consctruction Machinery Co., Ltd. to Ukraine . The cargos included the roller, excavator and some other construction machines .

3. The project of steel structures to Vietnam
July of 2007 we cooperated with CHINA SHANGHAI (GROUP) CORPORATION FOR FOREIGH ECONOMIC AND TECHNOLOGICAL COOPERATION carrying item cargos of a steel structure equipments to Vietnam , which was one year time charter . meanwhile there were some strict requirements with the steel structures which was no rain and no scratch in the process of loading and discharge , we met the requirements and did a perfect job.

4.The wind power plant project
January of 2008 , we carried the cargos of wind power plant project from ZheJiang Huayi Wind Energy Development CO., LTD . All the equipments were over large and over long , the height of the wind tower was 21.7M and the weight of every wind tower was more than 50 tons . We solved these different kind problems in the transportation and ensured the cargos of this project be loaded to the destination timely and smoothly .

5. Voyage charter of the pipelines to Haiti
January of 2008 we cooperated with Shanghai Liquefied Natural Gas CO., LTD . We carried liquefied natural gas pipelines in the way of voyage charter from Japan to Shanghai , and from Shanghai to Guangdong , then back to the port of yangshan in Shanghai . We arranged with all the jobs of the whole project .

6. The project of vehicles to Ukraine
February of 2008 , we cooperated with China Heavy Duty Truck CO., LTD carrying 107 vehicles from shanghai to Ukraine in the way of voyage charter . The vehicles were including tractors, trucks, cement mixers and flat trucks . The whole project service contained the transportation in China , clearance and shipping . Later we carried some other accessories of this project . In the whole process there was not any scratch on any vehicle , and we got the praise both from consignee and shipper .

7. The project of auto-vehicle exhibition in Dubai
September of 2008 , we cooperated with SHANGHAI VOSTOSUN INDUSTRIAL CO., LTD successfully carrying some construction machines to auto-vehicle exhibition in Dubai with the way of ro-ro vessel . For the reason of exhibition , the consignee asked that there was no any little scratch on any machine . any delay is prohibited. We finished the task perfectly and also applied the shipments of Clearance in Dubai .

8.The tower cranes project to LOBITO in Africa
October of 2008 , we cooperated with Hitachi company in japan. We carried some tower cranes to LOBITO which was a project of african-aid project . The engine of tower crane was over 80 metric tons and there were too many accessories in the project . We all knew that Japanese company had strict requirements in transportation . We met their requirements with a high quality service , and finally we carried eight tower cranes for several times .

9.The pile driver project
In the year 2009 , we cooperated with Hunan Sunward Intelligent Machinery Co., Ltd . We shipped 34 sets of hydraulic static pile driver to Ukraine . In the whole transportation , we kept the pile drivers in good condition .

10.The project to INDONESIA
September of 2010 , we cooperated with CHINA SHANGHAI (GROUP) CORPORATION FOR FOREIGH ECONOMIC AND TECHNOLOGICAL COOPERATION carrying 21 sets of construction vehicle from the making factory to the building site in Indonesia. Our door to door service secure the whole project being finished smoothly and timely .


上海巽航国际货物运输代理有限公司
地址:上海市延安东路55号工商联大厦702室 邮编200002 沪ICP备11009504号